Our Story

The Crew Behind Tomorrow's Homes

Haishu builds factory-direct space capsule homes that stack like Lego — but way cooler. Since 2020, we've planted futuristic pods across hundreds of accommodation spots worldwide, and we're just getting started.

Aerial view of the Haishu smart factory campus in Qingdao, China

Who We Are

30+ Avengers of Prefab Design

Picture a crew of engineers, architects and dreamers obsessed with one question: how small can luxury get before anyone notices?

Our answer became the Galactic A Series — capsules that arrive in one container, land on four steel legs, and light up in three days. Every unit is drawn, welded and wired inside our own 20,000 m² smart factory, so quality never depends on someone else's mood.

Today our pods sleep guests at mountain resorts, lakeside retreats and beach clubs on five continents. Our mission hasn't changed since day one: make you wonder how you ever lived without us.

0m² Smart Factory
0+Units Monthly Capacity
0+Projects Worldwide
0+Design Specialists

The Journey

From Sketch to Orbit

Six years, four continents, one obsession with compact luxury.

2020 — IGNITION

First capsule rolls out

Haishu is founded with a small team and a big idea: prefab homes shouldn't look like boxes. The first prototype measures 5.8 meters and turns more heads than expected.

2021 — LIFT-OFF

The 20,000 m² smart factory

Demand outgrows the workshop. We move into a purpose-built factory with automated cutting lines, powder-coating booths and a dedicated R&D hall.

2022 — ORBIT

Galactic A Series launches

Nine models across three footprints debut. CE and ISO9001 certification arrive the same year, opening the doors to Europe.

2024 — EXPANSION

300+ projects on five continents

Pods land at ski resorts in the Alps, beach clubs in Southeast Asia and glamping parks across North America. Monthly capacity climbs past 50 units.

2026 — TODAY

Going interstellar

The Ultra line doubles the fun vertically, dealer partners cover 20+ countries, and the next generation of capsules is already on the drawing board.

How We Think

Three Laws of the Haishu Universe

01

Obsess Over Quality

We sweat welds, seals and screws so you never have to. Every capsule passes a 120-point inspection before it's allowed near a container.

02

Design for Wonder

A home should make you feel something. Panoramic glass, ambient light and curves that make hotels jealous — engineered, not decorated.

03

Ship Smiles Worldwide

Factory-direct pricing, 40HQ-friendly dimensions and a support crew that answers in hours, not weeks. Your win is our launch window.

Come Say Hi

Visit the Factory, Meet the Crew

Factory tours run year-round. See a capsule born, test the interiors, and talk specs with the engineers who built them.